Saint Paul's Earthquake Strengthening Drawings
The links below are the drawings for the tender stage of the project.
The only tender received in October 2107 was rejected.
Floor Plan S101B
Roof Plan S102B
Sections S201B
Sections S202B
Steel Component Key
The only tender received in October 2107 was rejected.
Floor Plan S101B
Roof Plan S102B
Sections S201B
Sections S202B
Steel Component Key